top of page
BRICKTOBERFEST ON SEPTEMBER 20! CLICK HERE FOR DETAILS (1).jpg

Huntersville Road bridge closure now pushed back to November

ree

(BATESVILLE, Ind.) – Batesville drivers who hope to use Huntersville Road’s overpass got some bad news on Monday. 


The bridge has been closed for repairs since March and was originally scheduled to reopen in August.


INDOT has announced that the reopening has now been pushed back to at least mid-November. The schedule was changed due to project material adjustments, officials said. 


The $2.6M project is being conducted by Sunesis and the construction will also cause some slowdowns and periodic shoulder closures on I-74. 



 
 
Copyright 2025 812NOW, LLC. All Right Reserved
WANT TO GROW YOUR BUSINESS EMAIL NEWS_812NOW.COM TO (4).jpg
The 812 Ad Final (200 x 600 px) (1).png
Levensteins Big Sport ads 2 colm x 3 inch time corrected (4).jpg
CALL (812) 663-2105.jpg
protect Your HVAC System during the winter storm! (1).jpg

GET 812 STORIES IN YOUR INBOX!

bottom of page